enLanguage
Home > News > Content

Installation Techniques Of LED Full Color Point Light Source

Jun 09, 2022

The full-color LED point light source generally does not need to be dressed in a hurry first. You should have a good idea and look at the construction drawings of Guangchen lighting. The signals are sequential and cannot be returned to the input and output. The voltage of the LED full-color point light source is also positive and negative. It will be repaired after returning. It is better to try one or two before installing the products of Guangchen lighting for the first time. It is safer to install them later.

Send Inquiry
Contact Us
  • Tel: +86-592-7239932ext.812
  • Fax: +86-592-5788642
  • Email: sales@sfrlighting.com
  • Add: 3/Floor, No.171 TongAn Park, Industrial Concentration Zone, TongAn District, Xiamen City, Fujian Province, China